Paper Publications
- [1]王柏琳; 等待时间受限的紧凑型流水车间调度模型与算法, 中国经济出版社, 2021.
- [2]Wang Bailin*, Huang Kai, Li Tieke. Permutation flowshop scheduling with time lag constraints and makespan criterion. Computers & Industrial Engineering, 2018, 120(6): 1-14.(SCI二区,SSCI一区).
- [3]Wang Bailin*, Huang Kai, Li Tieke. Two-stage hybrid flowshop scheduling with simultaneous processing machines. Journal of Scheduling, 2018, 21(4): 387-411.(SCI,ABS 三星).
- [4]Wang Bailin*, Wang Haifeng. Multiobjective order acceptance and scheduling on unrelated parallel machines with machine eligibility constraints. Mathematical Problems in Engineering, 2018, (1):1-12. (SCI).
- [5]Wang Bailin*, Wang Haifeng, Li Tieke. Design of a monitoring and rescheduling system for steelmaking-continuous casting production. International Journal of Performability Engineering,2018, 4(12): 3076-3086(EI).
- [6]王柏琳*,李铁克.等待时间受限的置换流水车间调度问题的启发式方法.管理科学学报.(国家自然科学基金委管理科学部A类重要期刊,CSSCI).
- [7]王柏琳,李铁克,王海凤.安装时间和机器受限的订单接受与并行机调度[J].工程科学学报,2019,41(04):528-538. (EI).
- [8]王柏琳,王海凤,李铁克.工件可拒绝的有限等待置换流水车间调度算法[J].控制与决策,2019,34(03):459-469. (EI).
- [9]王柏琳*,李铁克,启发式算法求解等待时间受限的两阶段流水车间调度问题.管理工程学报,2014,28(2):182~190.(国家自然科学基金委管理科学部A类重要期刊,CSSCI).
- [10]王柏琳,李铁克.等待时间受限的流水车间调度问题的若干性质.系统工程理论与实践.(国家自然科学基金委管理科学部A类重要期刊,EI).
|
-
Wangbailin
|