Wang Bailin*, Huang Kai, Li Tieke. Two-stage hybrid flowshop scheduling with simultaneous processing machines. Journal of Scheduling, 2018, 21(4): 387-411.(SCI,ABS 三星)
Hits:
|
Pre One:Wang Bailin*, Huang Kai, Li Tieke. Permutation flowshop scheduling with time lag constraints and makespan criterion. Computers & Industrial Engineering, 2018, 120(6): 1-14.(SCI二区,SSCI一区)
Next One:Wang Bailin*, Wang Haifeng. Multiobjective order acceptance and scheduling on unrelated parallel machines with machine eligibility constraints. Mathematical Problems in Engineering, 2018, (1):1-12. (SCI)