Ning Zhao*, Song Ye, Kaidian Li, Siyu Chen. Effective iterated greedy algorithm for flow-shop scheduling problems with time lags. Chinese Journal of Mechanical Engineering. 2017, 3(30):652-662. https://doi.org/10.1007/s10033-017-0108-2.
Hits:
|
Pre One:Ning Zhao*, Lei Luo, Saipeng Zhang. An efficient simulation model for rack design in multi-elevator tier-captive shuttle based storage and retrieval system. Simulation Modeling Practice & Theory. v67:p100-116, 2016. https://doi.org/10.1016/j.simpat.2016.03.007.
Next One:Song Ye, Ning Zhao*, Kaidian Li , Siyu Chen. Efficient heuristic for solving non-permutation flow-shop scheduling problems with maximal and minimal time lags. Computers & Industrial Engineering. 2017, 113:160-184. https://doi.org/10.1016/j.cie.2017.08.024.