-
[41] 苗胜军, 万林海, 来兴平, 王双红. 三山岛金矿地应力场与地质构造关系分析. 岩石力学与工程学报, 2004, 23(23): 3996-3999. (EI 收录).
-
[42] 苗胜军, 蔡美峰, 夏训清, 刘华, 佟慧超. 深凹露天矿GPS边坡变形监测. 北京科技大学学报, 2006, 28(6): 515-518. (EI 收录).
-
[43] 苗胜军, 蔡美峰, 任奋华, 欧阳振华. GPS变形监测平差计算及不确定度分析. 岩土力学, 2008, 29(2): 562-566. (EI 收录).
-
[44] S.J. Miao, W.H. Tan, Z.F. Hou & P.L. li. Deformation prediction research based on improved Satio’s method with Verhulst grey model. Proceedings of the international young scholars’ symposium on rock mechanics, 28 April-2 May, 2008, Beijing, China. Published by: Taylor & Francis/Balkema. 919-923. (EI, ISTP收录).
-
[45] 苗胜军, 樊少武, 蔡美峰, 陈长臻. 基于加卸载响应比的载荷岩石动力学特征试验研究. 煤炭学报, 2009, 34(3): 267-271. (EI收录).
-
[46] S.J. Miao, X.P. Lai. Segment pre-blasting application on 52 m sub-level caving of steep and thick coal seam under complex conditions. Proceedings of the Fifth International Symposium on In-situ Rock Stress, 2010, 355-359. (ISTP收录).
-
[47] Miao Shengjun, Wang Shuren, Li Yuan. Numerical Research on Top Coal Movement, Failure Mechanism and Supports' Stresses Characters of Fully Mechanized Top-Coal Caving in Steep Thick Seam. Proceedings of 7th International Symposium on Safety Science and Technology (ISSST), 2010, 1627-1631. (ISTP收录).
-
[48] S.J. Miao, X.P. Lai, F. Cui, J.T. Cao. Top coal deformation characteristics of high section fully-mechanized top-coal caving for extra-steep-thick seam. Proceedings of 44th US Rock Mechanics Symposium - 5th US / Canada Rock Mechanics Symposium, United States. 2010, 117-122. (EI收录).
-
[49] Miao Shengjun, Lai Xingping, Cui Feng. Top coal flows in an excavation disturbed zone of high section top coal caving of an extremely steep and thick seam. Mining Science and Technology (China), 2011, 21(1): 99-105. (EI收录).
-
[50] MIAO Sheng-jun, LI Zheng-sheng, JI Dong, LI Jiang-bo. Dynamic measurements and behave laws of tunnel pressure in Deep mining. Proceedings of International conference on electric technology and civil engineering, 2011, 250-253. (EI收录).