Chu H, Liao X, Chen Z, et al. A New Methodology to Determine the Reasonable Buildup Test Time for Tight Oil Wells: A Case Study from the Ordos Basin. Presented at the SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition, 23-26 April, Dammam, Saudi Arabia, 2018. (SPE 192238)
Date:2023-08-02 clicks:
Translation or Not:no