Xuejuan Liu, Wenbin Wang, Rui Peng. An Integrated Preventive Maintenance and Production Planning Model with Sequence-dependent Setup Costs and Times, Quality and Reliability Engineering International, 2017, 33, 2451-2461. (SCI)
Hits:
|
|
Xuejuan Liu, Wenbin Wang, Rui Peng. An Integrated Preventive Maintenance and Production Planning Model with Sequence-dependent Setup Costs and Times, Quality and Reliability Engineering International, 2017, 33, 2451-2461. (SCI)
Hits:
|
|