Xuejuan Liu, Wenbin Wang, Rui Peng, Fei Zhao. A delay-time-based inspection model for parallel systems. Journal of Risk and Reliability. 2015, 229(6): 556-567. (SCI)
Hits:
|
Pre One:Xuejuan Liu, Wenbin Wang, Rui Peng. An Integrated Production and Delay-time based Preventive Maintenance Planning Model for a Multi-product Production System. Eksploatacja i Niezawodnosc-Maintenance and reliability. 2015, 17, (2): 215–221. (SCI)
Next One:Xuejuan Liu, Wenbin Wang, Fei Zhao, Rui Peng. Joint Lot-size and Preventive Maintenance Optimization for a Production System. International Journal of Performability Engineering, 2015, 11, (1): 91-96. (EI)